Putting this information up here for future keeping. I seem to need to keep referring to these from time to time and it will be handy to have them saved somewhere.
PIR for RailCorp (Now SydneyTrains) Sydenham Signal Box Failure on April 12th.
110429-Signal_System_Report
Presentation on the Stabilisation of the Melbourne Train Control System
Legacy Train Control System Stabilisation
This entry was posted on Wednesday, January 17th, 2018 at 08:53 and is filed under Architecture, Automation, Backups, Comedy, Consulting, Hardware, Performance & Monitoring, Ramblings, Windows. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.
Follow me on Mastodon